| ENGINEERING & STUDIES | |
| Studies | . EKİNCİLER DEMİR ÇELİK A.Ş/İskenderun - Minimill |
| - Feasibility Studies | - General and detailed layout |
| - Market Survey | - Basic Design for Structure and Buildings |
| - Capital Cost Estimates | - Water Circulating and Treatment Facilities |
| - Production Cost Estimates | - Utilities Design |
| - Financial Planning | - Roll Pass Design |
| - Restructuring and Rehabilitation | - Slitting Process |
| . İZMİR DEMİRÇELİK A.Ş./İzmir- Minimill | |
| Engineering & Design | - General and Detailed Design |
| - Plant and Process Layout covering all Infrastructure and | - Detailed Design for Structure, Building and Facilities |
| Details | - Water Circulating and Treatment Facilities |
| - Water Circulation and Treatment Plants | - Detailed Utilities Design |
| - Reheating Furnace (Pusher Type) | - Rolling Mill Engineering |
| - Utilities Design | - Single and Double Slit Roling |
| - Electrical Systems Design | - Thermoprocessing |
| - Process Automation and Design | . AVANGAN ROLLING MILLS- IRAN |
| - Roll Pass Design | - Layout |
| - Slit Rolling | - Preliminary Studies |
| - Thermoprocessing | . YAZFOULAD ROLLING MILL - IRAN |
| - Layout | |
| References | - Preliminary Studies |
| . KAPTAN DEMİR ÇELİK.A.Ş./İstanbul-Steelmaking Plant | |
| - General and Detailed Layout | |
| - Basic Design for Structure and Auxilaries | |
| - Water Circulating and Treatment plant | |
| - Utilities Design | |
| - Basic design for Electrical Facilities | |
| PROJECT MANAGEMENT | |
| Project Management | . EKİNCİLER DEMİR ÇELİK.A.Ş./İskenderun- Minimill |
| - Cost Estimating and Control | - New Continous Rolling Mills with the output of 850.000.tpa |
| - Planning and Scheduling | - Rewamping of Meltshop with the output of 900.000 tpa |
| - Tender Documents and Bidding | - General and Basic Engineering |
| - Procurement and Contracts | - Procurement of all Equipment and Services |
| - Inspection and Expedition | - Contracts Management |
| - Supervision During Erection and Construction | - Providing Financial needs |
| - Assistance in Commissioning | - Recruitment and Training |
| - Recruitment and Training | . İZMİR DEMİR ÇELİK.A.Ş./İzmir - Minimill |
| - Assistance During Operation | - New Meltsop EAF 70 MT, CCM 6 Str and Auxiliaries |
| - Medium Section Mill 150.000 tpa | |
| References | - Bar Mill 250.000 tpa |
| . KAPTAN DEMİR ÇELİK A.Ş./İstanbul- | - Rewamping of Bar Mill to increase to 600.000 tpa |
| ElectricSteelmaking Plant | - General and Basic Engineering and Design |
| - EAF100 mt, LF , CCM 6 Str and Auxiliaries with the | - Implementation of the Projects |
| output of 900.000 MT | - Procurements and Contracts Management |
| - General and Basic Engineering | - Financial Plan |
| - Specification and Procurement of Equipment and Services | - Orgaization Setup and Recruitment |
| - Planning, Negotiation and Coordination of the Contracts | . SİVAS DEMİR ÇELİK A.Ş./Sivas - Minimill |
| - Providing Financial Needs and Evaluations | - EAF 80 MT, LF, CCM 6 Str |
| - Implementation of the Project from Feasibity Studies up to | - Bar and Wire Rod Mill 80 tph |
| Start up | - Supervising the Project |
| - Organization Setup, Manpower Planning | |
| - Assistance for Recruitment of Crew and Staff | |
| CONSULTING SERVICES | |
| Consulting for Privatisation | References |
| - Country Profile | . Republic of Turkey,Prime Ministry , Privatisation Administration |
| - Market Analysis | - İSDEMİR - İskenderun Demir Çelik A.Ş., Privatisation Project; |
| - Company Audit | Capacity Increase, Modernisation and Restructuring . Feb 1999 |
| - Technical Audit | (Consortium; Mns - Finansinvest- Atkins/UK) |
| - Future Plans and Analysis | . Kroman Steelworks A.Ş.- İstanbul |
| - Case Studies on Alternative Scenarios | - Supervising the Acquisition of Privatised ASİLÇELİK A.Ş - Alloy |
| Steelmaking Plant | |
| Consulting for Operations & New Projects | - Consulting to Buildup a Medium Section Mill 450.000 tpa |
| - Organisation Plan and Manning Schedule | - Consulting to Buildup a Wire Rod Mill 600.000 tpa |
| - Process and Products Optimisation | . Ekinciler Holding A.Ş.- İstanbul |
| - Cost Analysis and Optimisation | - Strategic plan for Group of Companies |
| - Overcoming the Bottlenecks | - Master Plan for Steelworks and Port Facilities |
| - Assistance in Equipment Procurement | - Acquisition of IZMIR DEMIR CELİK Steelworks |
| - Assistance for Decision on Technology, Process and Layout | - Acquisition of ÇELİKHALAT Wire Rope Making Plant |
| - MIS Setup | - Acquisition of Privatised SİVAS DEMİR CELİK works |
| - New Business Developments | - Acquisition of Privatised LALAPAŞA Cement Plant (together with |
| HOLDERBANK-Swiss) | |
| Consulting for Merger & Acquisitions | - Acquisition of Privatised GÜNEYSU Juicemaking Plant |
| - Company Audit | - Business Plan for a Thermal Power Plant |
| - Technıcal Audit and Analysis | - A Study for The Global Energy View of Turkey |
| - Cost and Value Estimates | . ISPF Ittefaq Steel Production Co.-Dammam/Saudi Arabia |
| - Supervising the Rewamping and Capacity Increase of existing | |
| Rolling Mills | |
| - Business Plan for A New Steelmaking Plant 600 000 tpa | |
| - Business Plan to Invest in a Stelmaking Plant at Ukrain | |